onsdag 21 december 2011

New Running boards for the Hebster. Same manufactor and shape as the ones on Christian Grundmann's -38 recieved.

New lower doorpanels for the Hebster from the same manufactor.

lördag 17 december 2011


Top of the second Zenith cleaned and reassembled. Now the bottom needs the same attention as the first one too.

Lots of oxidation down there in one of the barrels, but less than in the first zenith though..

tisdag 6 december 2011


All cylinders and pistons fitted including pistonrings. Now it is time for the cylinderheads.
The heads still are under work getting refurbished before mount,

måndag 5 december 2011

Deckheight measured on all cylinders and numberone finally mounted permanently. Just have to fit the rings on the two remaining pistons and push on the cylinders. Then it's time to mount the heads.

No pictures for now but you get the picture from the previous post.

fredag 2 december 2011

First piston and cylinder ready for deckheight measuring. The Porsche Schlepper is getting closer... :)